Manufacturing

phases-usinage.jpeg
Capture.JPG

At the IUT of Cachan, I regularly practice production during TD and TP.

I regularly use 3-axis milling machines and 2-axis lathes, then in parallel 4-axis milling machines, 5-axis and 3-axis lathes.

  Here are some of the things I can do:

Realization of manufacturing ranges and phase contracts

  • Therange of manufacturingprovides the technical information needed to manufacture the part. It is written after the CAD of the part.

Capture.JPG

During aSAE(learning and evaluation situation), I realized the manufacturing range and the phase contracts of a part called nuts.

 I was able tolearnat :

  • Define the dimensions of a blank before machining.

  • Determine the machining steps required to manufacture the part.

  • Choose the correct positioning of the part.

  • Choose tools adapted to the machining step.

  • Determine cutting speeds, depths of cut and allowances.

Capture_edited_edited.jpg
  •  Lephase contractallows you to detail the machining operations of a defined phase and to set all the machining parameters (cutting speed, depth of cut, DEC). It is carried out after the production range.

CAM(computer aided manufacturing)nuts on TopSolid

Mon projet (10).png

Programming the machining:

  • Create the stock on the part​

  • Place the chuck in the machine

  • Choose the tools to put on the turret (according to the phase contract)

  • Create the desired machining step by inserting all the parameters found on the phase contract

  • Make a check to check that the machining is going well and that the part is machined as desired

Machining on 2-axis lathe

Mon projet (11).png

Plantpart: 

  • Deburr the part if necessary​

  • Calculate the DECS (offset = distance between the workpiece carrier origin and the program origin)

  • Measure gauges tools

  • Mount the tools on the turret (positions found on the phase contract)

  • Insert tool gauges

  • Import the CAM file to the machine

  • Perform a machining simulation to see that the program is well configured

  • Mount the jaws (choose soft or hard jaws depending on the machining step)

  • Make a vacuum machining to make sure that everything is well configured (no risk of collisions, correct tool paths).

  • Mount the part in the chuck

  • Machine the part

téléchargement.jfif

Correction of gauges tools 

TD done in progress

​

  • Measure machined parts to identify deviations from the average dimension

  • Determine the parameter(s) on which it is necessary to intervene to approach the average dimension

  •   Calculate the correction on the designated parameter(s)

​

640px-Vernier_Caliper_150mm.svg.png
9778007-etrier-icone-logo-illustrationle-mesure-outil-et-instrument-symbole-modele-pour-gr
5211.jpg

Make a part, following these steps: ​

  • Realize the manufacturing ranges and phase contracts

  • Carry out the CAM of the part on the desired machine

  • Machine part 

  • Correct tool gauges